Fire
Prevention and Inspection Information
The
most effective way to fight a fire is to prevent it before it
starts. For this reason the City of Celina has adopted Codes and
Regulations aimed at making our buildings and homes safer from
the ravages of fire. These requirements will result in fewer fires,
less damaging fires and an improved insurance rating.
The
City of Celina has adopted the 2006 International Fire Code, with
NCTCOG amendments (option B) and other local and regional amendments.
A copy of these amendments may be sent upon request. Please direct
inquiries to the Celina Fire Marshal’s Office at (972) 382-2653.
An important provision of the fire code concerns installation
of fire safety systems. Installation or alteration of any Fire
Protection or Life Safety System shall only be performed by State
Licensed Contractors. Plans for these systems must be submitted
for review and must be approved by the Celina Fire Department
prior to any Fire Protection or Life Safety System installation
or alteration.
Three (3) sets of plans are required for the review process. The
plans should be folded to fit in an 8.5 x 11 folder. However,
rolled plans will be accepted if folding is impractical due to
the number of sheets in the plans. Plans requiring review and
approval may be mailed or hand-delivered to Celina Fire Administration
at 302 W. Walnut Street #200, Celina, TX 75009. Plans available
in either PDF or CAD formats may be sent via email to the Fire
Marshal at mmetdker@celina-tx.gov.
Please allow ten (10) business days for the plan review. The submitter
will be contacted by phone when the plans have been approved or
rejected. If the plans are rejected, a full explanation of the
reasons will be provided along with suggestions for correcting
the problems.
Please note that a set of approved plans must remain at
the job site. For Inspections or Acceptance Tests, please
contact the Fire Marshal’s Office at (972) 382-2653. Allow
five (5) business days for completion of an inspection and the
reporting of the results.
Fire sprinkler and fire alarm plans must include a plan
review submittal sheet with the plans.
CONTRACTOR'S
INFORMATION
The
Celina Fire Prevention Division has prepared comprehensive documents
with information on the permitting and inspection processes. Please
review these documents by clicking on the links below.
To
submit your Fire
Alarm Plans
The
requirements for Fire
Alarm Installation
To
submit your Fire
Sprinkler Plans
The
requirements for Fire
Sprinkler Installation
The
requirements for Pre-action
Fire Sprinkler Installation
The
requirements for Hood
System Installations
The
requirements for Fire
Lanes
The
requirements for Fire
Hydrants
The
requirements for Access/Security
Gate Control
The
requirements for Tent
Installations
Information
and application for Retail
Propane Storage
A
check list and requirements for Underground
Storage Tanks
Am
I going to need a Certificate
of Occupancy?